t9

Default image
The strategy is based upon on Bollinger Bands indicator set at 32 period, plus one simple moving average SMA, set at 34 period. If the price is above the SMA 34 period, and also above the first band (and there is not an open osition active) then it opens a buy position The sell setup occurs when the price is bellow the SMA 34 and also bellow the second line of Bollinger band The timeframe is set for 30 minutes, the lot amount is fixed at 3mil/pos. for the EUR/JPY instrument and the take profit and stop loss is set to 28 and 18 pips.
Version: Date: Status: Description:
jan 2021 13.01.2021 Not running jan 2021  Download
ian 2021 13.01.2021 Executed  Download
jun19 08.07.2019 Not running jun19  Download
JUN19 08.07.2019 Not running GBPCAD  Download
mar19 31.03.2019 Executed mar19  Download
dec.02 14.12.2018 Not running d  Download
dec18 03.12.2018 Comp. error  Download
dec 03.12.2018 Executed The strategy is based upon on Bollinger Bands indicator set at 30 period, plus one simple moving average SMA, set at 55 period. If the price is above the SMA 55 period, and also above the first band (and there is not an open position active) then it opens a buy position The sell setup occurs when the price is bellow the SMA 34 and also bellow the second line of Bollinger band The timeframe is set for 30 minutes, the lot amount is fixed at 4mil/pos. for the EUR/USD instrument and the take profit and stop loss is set to 18 and 128 pips.  Download
nov2 22.10.2018 Not running  Download
nov2 22.10.2018 Not running  Download
nov 22.10.2018 Executed  Download
t901 02.06.2017 Executed  Download
t99 beta 25.05.2017 Executed gbp/usd  Download
t99 beta 25.05.2017 Not running gbp/usd  Download
t9 beta 06.04.2017 Executed changed to GBP/usd  Download
t6 27.02.2017 Executed testing  Download
t6 27.02.2017 Not running testing  Download
t6 27.02.2017 Not running testing  Download
t6 27.02.2017 Executed  Download
t5 31.01.2017 Not running  Download
t5 31.01.2017 Comp. error  Download
t4 01.12.2013 Comp. error t34  Download
t33b 20.11.2013 Executed take2  Download
t2 07.11.2013 Executed update tp  Download
t33 13.10.2012 Not running new tp  Download
t32 02.05.2012 Executed take2  Download
t32 02.05.2012 Comp. error take2  Download
t31 01.05.2012 Executed again  Download
t30 01.12.2011 Not running one more try  Download
t29 24.11.2011 Not running dif lot size  Download
t28 07.11.2011 Not running  Download
t27 01.11.2011 Executed same as before  Download
T26 01.11.2011 Executed the same as before  Download
t25 24.10.2011 Executed reset  Download
t24 01.10.2011 Executed here we go again  Download
t23 17.09.2011 Not running the last one stop running  Download
t22 15.09.2011 Executed testing  Download
t21 15.09.2011 Executed for Sept  Download
t20 12.09.2011 Comp. error still...  Download
t19 06.09.2011 Executed still  Download
t18 31.08.2011 Executed September strategy  Download
t17 25.08.2011 Executed new instrument  Download
t16 24.08.2011 Executed again...  Download
t15 24.08.2011 Executed let's keep it simple  Download
t14 17.08.2011 Executed back to basics  Download
t13 15.08.2011 Executed playing range  Download
t12 13.08.2011 Executed back to basics  Download
t11 01.08.2011 Executed still a little summer left  Download
t10 09.07.2011 Executed still some summer left :)  Download
t9 01.07.2011 Executed summer strategy  Download
orto leave comments


(few words about added changes)

(example: 1.1, beta, alpha)